How Did a Tiny Skunk Works Team Beat Bigger Groups?
David Senra says Kelly Johnson built the world's fastest aircraft with 135 engineers, then sets that against a company with 1,206 people in quality control alone. One subcontractor had 40 people inspecting, coordinating, and reporting, and only 35 people building the instrument. More people were checking the work than doing it.
Reading Johnson, Senra says suppliers have to be given the same rules and permissions as Skunk Works, so everyone concentrates on the product instead of a system. The customer has to keep a small project office too, or the method does not work. Johnson means small. One other program used 145 Army people just to interface with the designer and manufacturer. Skunk Works, for both the CIA and the Air Force representatives on the U-2 and the SR-71, used six.
#419 Kelly Johnson: Skunk Works ·
From the transcript
And so he's looking at this project. And as they're trying to build this aircraft, he discovered that there was 1,200, 1,206 people employed just in quality control. Remember, he built the world's fastest aircraft with 135 engineers.
This company has 1,206 just in quality control. This subcontractor had 40 people inspecting, coordinating, and reporting. They only had 35 people building the actual instrument. Think about that. They have more people inspecting, coordinating, and reporting than doing the actual work. And so what he learns is you have to actually run this through all of your subcontractors, too.
And so he says suppliers and others associated with the project must be extended the same kind of rules and permissions that are given us for the entire program. This cuts red tape and costs and allows all participants to concentrate on the product instead of a system. It is so simple. And he extends this to the customers, which he's already mentioned once.