David Senra, reading Kelly Johnson's autobiography, says Johnson wrote 14 points as the basic operating rules of Skunk Works. The manager must have complete control and report to a division president or higher. Military and industry project offices must be strong and small. Restrict, in an almost vicious manner, how many people touch the project, and use a small number of good people. Keep drawings simple and easy to change. Require few reports, but record important work thoroughly. Review costs every month, including what is already spent and the cost through the end. Do not let the books run 90 days late or surprise the customer. The motto Senra reads is be quick, be quiet, and be on time, and he adds be cheap.
The contractor takes more responsibility for vendor bids. Commercial bids are often better than military ones. Push inspection back to subcontractors instead of duplicating it. The contractor must flight-test early, or the team loses the ability to design the next vehicle. Agree the hardware specifications before the contract. Fund the work on time so the contractor is not running to the bank to carry a government project. The military office and the contractor need daily trust, which cuts correspondence to a minimum. Strictly control outsider access. Because only a few people are used, reward good performance with pay, not by how many people someone supervises.
#419 Kelly Johnson: Skunk Works ·
From the transcript
In contrast, the total at Skunk Works for both the CIA and the Air Force representatives for the U-2 and the SR-71 was six people. And so as a way to spread these ideas throughout his organization and anybody they interface with, he wrote this thing called 14 points. Kelly Johnson's 14 points are the basic operating rules of Skunk Works. And so I'm just going to run through them with you right now.
Number one, the skunk works manager must be delegated complete control of his program in all aspects. He should report to a division president or higher. Number two, strong but small project offices must be provided both by the military and industry. number three the number of people having any connection with the project must be restricted in an almost vicious manner use a small number of good people number four a very simple drawing and drawing release system with great flexibility for making changes must be provided number five there must be a minimum number of reports required but important work must be recorded thoroughly Number six, there must be a monthly cost