Why Does Stark Design for the Factory Before the Demo?
Uwe Horstmann · Johannes Schaback · Pat Grady · Luciana Lixandru
Johannes Schaback says Stark designs for the factory before it designs for a demo. Every program optimizes for time to market and for production readiness, and those two goals compete.
If the only goal is speed, the team can end up with something it can show and then cannot build in volume. A Formula One car is his comparison: it can be ready quickly, and almost nobody produces it in large numbers. Stark moves manufacturability earlier, which he calls shifting left, so that problem is not left as debt to fix after the prototype exists. Component choice is part of the same decision. The team does not always buy the most advanced camera. It buys one that is very good and can be purchased in large numbers.
Production readiness is a design constraint from the start of the program, not a step that waits until the demonstration is over.
European Defense Sovereignty Starts in the Factory: Stark’s Uwe Horstmann and Johannes Schaback ·
From the transcript
So there's a lot of things that we can use across domains, as we call them. So dimensions, if you will. Can we talk about a topic that may sound boring on the surface, but it's really make it or break it for a company like you, which is manufacturing? How do you go from zero to manufacturing at real scale? There are two goals when we start a program.
We optimize for time to market, and second, we optimize for production readiness. And they are often partially competing, because if you're optimizing only time for market, then you may end up relatively quickly with a product that you can show and demonstrate, but then it's very difficult to For example, a Formula One car, you only build one.
You're very quick in order to be ready, but you hardly ever produce them in large quantities. And so from an engineering perspective, this has to happen. We shift left on manufacturability. That's extremely important because otherwise you accrue a debt that you have to fix later on. And that is really just the beginning because the moment you decide on which components you buy, Supply chain resilience plays a massive role in the decision making process early on as well.