Back to The hidden supply chain costs of the AI boom, with Willy Shih.
How Does Willy Shih Size Up a Foxconn Plant?
Willy Shih says he sizes up a plant from first principles: once Foxconn was not going to build a glass plant across the street in Wisconsin, an LCD factory there was not going to exist.
A panel factory needs a stable floor, so the site has to include the structural steel and the concrete that hold it still. After an earlier Decoder conversation, residents went to the town zoning hearings, sent him the plans, and asked whether this would be a panel factory. He told them it would not. The drawings did not have enough concrete for one.
The Verge had already used him as a source on what it takes to build an LCD plant anywhere, not only in Wisconsin. The missing concrete was the tell.
The hidden supply chain costs of the AI boom ·
From the transcript
Willie Shee, you're an economist, you're a professor of management practice at Harvard, and you're also the author of the new book, Where Does My Stuff Come From? The Powerful Economics Behind Global Supply Chains. Welcome back to Decoder. Well, thanks for having me back. I am very excited to talk to you. You and I first started talking ages ago when The Verge was covering Foxconn in Wisconsin, and you were a reliable source of information on what it takes to actually build an LCD plant anywhere, not just in Wisconsin.
You know, the Foxconn in Wisconsin thing was kind of funny because, you know, I tend to go on first principles on these things. Once I knew they weren't going to build a glass plant across the street, it's like there's no way there's going to be a factory. Now, what happened afterwards, of course, is people heard your show, And then I start getting calls from people who live in the community.